(618) 444-9976 24/7 emergency sewer service · St. Clair and Madison counties
Excavator trench beside a two-story house for a sewer line

Fairview Heights · St. Clair County

Sewer work in Fairview Heights, from the permit to the patch

Digging in a Fairview Heights street, alley or sidewalk takes a city permit, a $2,500 bond and a prequalified or bonded contractor.

When the sewer runs under the street

Plenty of laterals meet the main out under the pavement, and in Fairview Heights that changes the job. Chapter 33 of the city code requires a permit from the Director of Public Works and Streets before anyone digs in a street, alley or sidewalk. The permit needs a $2,500 bond, it is issued only to a prequalified or bonded contractor, and that contractor answers for the cut for a full year afterward.

Emergencies are allowed for. A dig that cannot wait can start right away, as long as the permit is applied for by the next business day, so a broken line on a Friday night does not have to sit until Monday.

About the houses in Fairview Heights

The median house here was built in 1974, toward the end of the years when Orangeburg and mortared clay were still going into the ground. A camera run from the clean-out shows which one you have and where it is failing, and tells us before we ask for a street permit whether the problem is under the lawn or under the road.

How we work in Fairview Heights

  • St. Clair County, Illinois
  • Permits and inspections: Fairview Heights Director of Public Works and Streets
  • Emergency calls answered 24/7

Fairview Heights sewer trouble?

(618) 444-9976 Book Service

Answers

Common sewer questions in Fairview Heights

Do I need a permit to dig in the street in Fairview Heights?

Yes. Chapter 33 of the city code requires a permit from the Director of Public Works and Streets before anyone digs in a street, alley or sidewalk. It needs a $2,500 bond and is issued only to a prequalified or bonded contractor, so a homeowner cannot pull it alone.

Can an emergency sewer repair start before the permit in Fairview Heights?

Yes. The city code lets emergency digs start right away, as long as the street permit is applied for by the next business day. So a sewer line that breaks under the road on a weekend does not have to wait until Monday to be dug.

Who is responsible for a street patch after a sewer repair in Fairview Heights?

The contractor who made the cut, for one year. Fairview Heights holds the permit holder responsible for the excavation for a full year after the work, which is part of why the city requires a bond and a prequalified or bonded contractor.

How old are houses in Fairview Heights?

The median Fairview Heights house was built in 1974, according to the Census Bureau. Houses from that era can still have clay laterals with mortared joints, or Orangeburg near the end of its run, so a camera inspection is worth doing before buying or when drains start to slow.

Where your message goes and what the site keeps: our privacy policy.

Backed up right now?

Call the crew with the camera and the excavator.

A person answers (618) 444-9976 day or night. Not an emergency? Send the form and we will set a time to run the camera.

Call Book Service